BIPC'S PROJECT COMPLETION CELEBRATIONS: WHERE IS THE PRODUCTIVITY?
BIPC's celebration of the completed carbonated drinks production line at Food Basket Brewery raises questions about the actual productivity and commercial performance of its investments. Given that ZEVA beer was introduced through contract brewing before the permanent brewery was completed, why are samples of the proposed carbonated drinks not yet available? Similar questions surround the operational status of the CNG and electric vehicle charging station, the Green Wheels taxi initiative and Benfruits. Benue people deserve more than completed facilities, promotional videos and ambitious projections. They deserve verifiable production figures, functioning services, actual jobs, commercial sales and measurable economic returns on public investments.
By Aondoakaa Tersugh Daniel, 03/11/2026
Completing a project is one thing. Delivering economic value through it is another. That difference seems lost on the Benue Investment and Property Company (BIPC), which now treats every completion as a reason for celebration. Its latest announcement is the completed carbonated drinks production line at Food Basket Brewery. Before anyone applauds, Benue people deserve to know when they will see the products and the returns.
A production line without products is only machinery. Where are the samples? What are the brands? Has any product passed quality testing? Have distributors and retailers been engaged? When will the drinks reach the market? BIPC cannot claim these questions are premature, because it has already shown that product testing does not have to wait for a finished factory.
Consider ZEVA Premium Lager Beer. It was in circulation before the brewery was completed, through a contract brewing arrangement that BIPC said was meant to test the market. If that was possible for beer, why is it impossible for carbonated drinks? Either samples can be presented now, or the public should be told honestly where product development stands.
The pattern is the real problem. BIPC celebrated the remodelling of its Oil and Gas Station as an integrated facility offering petrol, CNG refuelling, electric vehicle charging and solar powered charging. Is it fully operational today? Are motorists buying CNG there? Can the public use the charging points? What has utilisation been since the unveiling? A completed facility and a working one are not the same thing.
Green Wheels deserves the same scrutiny. BIPC launched the electric and solar powered taxi initiative with a promise of 1,500 jobs. How many vehicles are actually carrying passengers in Makurdi, Gboko and Otukpo? How many people have been employed, and how much revenue has the scheme earned? Is the booking system working? Those figures measure progress. Photographs from a launch ceremony do not.
Benfruits belongs in this conversation too. BIPC announced preparations for full production, yet the public has seen no figures on volumes, products on sale, distribution or revenue. Installed equipment and a ready factory prove nothing about output.
BIPC must learn to separate what it projects from what it achieves. A project that targets 1,500 jobs has not created 1,500 jobs. A factory with installed capacity is not producing at that capacity. A charging station is not a viable business until customers use it. A completed drinks line has not yet shown that anyone will buy the drinks. These are basic principles of investment management, and they matter more when the money belongs to the people of Benue.
BIPC is an investment company owned by the Benue State Government. It is not a studio for videos of factory tours and ceremonial unveilings. Its performance should be judged by revenue earned, jobs actually created, actual output against capacity, products available in the market and returns paid to the state. A serious institution would publish these figures in periodic performance reports.
Nobody is against celebrating milestones, and the drinks line is one. But celebration cannot replace accountability, especially with the 2027 election season approaching and the temptation to treat BIPC as the government's publicity machine. If BIPC has delivered results, let it publish the numbers and let the public judge. If some projects are still awaiting commissioning, let it say so and give realistic timelines.
The question has never been how many projects BIPC has completed. It is how much value those projects have delivered to Benue State. The carbonated drinks line should open a conversation about real production, not become another occasion to cheer installed machines as if the commercial goal had been reached. Benue people want products on shelves, services that run, jobs that exist and returns that reach the state treasury.